In this new construction at Aspen Dental, we installed all of the groundwork, switchgear, outside lighting, and relocated two lighting poles.

In this new construction at Aspen Dental, we installed all of the groundwork, switchgear, outside lighting, and relocated two lighting poles.
The project required over 10,000 on-site man-hours to complete, showcasing our team’s dedication, efficiency, and commitment to safety—accomplishing the entire installation without any incidents or accidents.
The Chick-fil-A in Boiling Springs underwent an exciting renovation, transforming the existing restaurant into an updated and welcoming space for the community.
The Caliber Collision projects in Duncan and Boiling Springs were mirror-image installations, showcasing our ability to deliver consistent, high-quality work across multiple locations.
The Sud Stop project in Spartanburg was a comprehensive electrical installation for a state-of-the-art carwash facility.